QUOTE REQUEST

Quote Request

CONTACT DETAILS
PRODUCTION & ROUTING
Preferred type of busses
Backline-Trailer
NOTE
PRIVACY POLICY
Privacy Policy
SECURITY QUERY & SEND
captcha

CHECKLIST

  • 1. Number of beds required
    The main driver has his own bunk in the bus. Where two drivers are prescribed, the second driver must be accommodated in the available beds. A maximum of 16 beds per bus is possible depending on the option chosen.

  • 2. Two drivers
    In the event that the driving and rest periods are exceeded, two drivers per bus are automatically included in the calculation.

  • 3. Time requirement
    Average speed: 80 km/h without trailer 70 km/h with trailer More information on: Driving and rest periods

  • 4. Routing
    In order to provide an accurate offer, we require a list of the stops. This information must include the Pick-Up and Drop-Off location. Column A "Date" Column B "City - Place" Column C "Info"

  • 5. Ferries and Eurotunnel
    Lead time for high season: Ferries: 3-4 months Eurotunnel: 2-3 months

  • 6. Costs
    You will receive an offer inclusive of all transportation costs: Buses, one or two drivers (as applicable), toll roads, ferries, tunnel